Energy Reforms - Essential For Mitigation
From 2000-01 to 2007-08, Gujarat’s net from Naphtha to Gas in 2001 and was
electricity generation (Million kWh) has registered as a CDM project. Due to this the Impact of Transmission and
increased by 28.75% and the CO, estimated reduction in CO, emission is Distribution losses and Generation Efficiency
intensity (tCO, /MWh) has reduced by 99,462 tCO, per annum. a ee eri ; ea Beret
i¢ lransmission an zt ion was increase: _ fo, Which was
4.18% vis-a-vis India’s net generation, Gujarat Industries and Power Corporation (T&D) loss during the year 2000-01 was equivalent to ae cubist Gf? exon
which has increased by 37.34% and CO, Ltd (GIPCL) 140 MW power plant has been 35.27% and the generation efficiency, 1,276 MW — equivalent to 59.31% of
intensity has reduced only by 0.93%. switched over from Naphtha to Gas in 2003. i.e. Plant Load Factor (PLF) was the additional generation demand of
ty y PY ° As a result of this, th ° imgated reduction 67.85%. The installed capacity was 2,148 MW. Thus, the total increase in
. oo ee cohen 8,588 MW at the end of 2000-2001, power demand is 29.47%, while the
Promoted Gas for a Better Tomorrow in CO, emission is approx. 80,000 tCO, per which was increased to 9,864 MW at actual capacity addition is only 14.85%,
annum. the end of 2008-09. The power demand resulting into an impact of 14.62%. The
GSECL has set up 219 MW Gas Based was 7,289 MW and 9,437 MW in year-wise details of installed capacity,
Combined Cycle Power Plant at Dhuvaran corresponding years. During 2001 to demand catered to, T&D losses, etc., are
(District Anand). The estimated reduction Others 2009, the T&D losses were reduced by tabulated below:
: - oe : : : : : : : 14.13% and th ti ffici
in CO, emission from this project is In view of high Global Warming Potential ears sass caumaar mad
214,000 tCO, per annum. GSECL has (GWP) of N,O gas, State owned Gujarat MCs imipien OL ReeT ay OAL
. . aes capacity Demand Generated Losses
taken up implementation of highly Narmada Valley Fertilizer Company has put in MW catered toin MW. million kWh
emicient i> MW Combined: Cycle: Sas a special catalyst in the ammonia 2000-01 8,588 67.85 7,289 41,983 35.27
Based Power Plant at Utran (District combustion furnace for reducing emission a ars aia a re a
Surat) on Engineering, Procurement and level. The equivalent CO, emission b . , ” é
Construction (EPC) basis. reduction will be 332,948 MT CER, taking z00z03 8,582 ek UBER 46,794 35.90
310 GWP as a factor for N,O. 2003-04 8,689 64.72 7,605 46,123 30.90
Fuel Conversion 2004-05 8,761 70.13 8,078 49,437 30.64
Gujarat Alkalies and Chemicals Ltd (GACL) 2005-06 8,977 68.01 8,170 Spray) 26.51
90 MW captive power plant was converted 2006-07 9,561 67.53 8,538 53,520 22.20
2007-08 9,942 76.19 9335 58,825 21.80
2008-09 9,864 75.32 9,437 60,826 21.14
Source: Energy and Petrochemicals Department, 2010